Very happy with Edibon's latest installation! This time, we have moved to the first University in Albania, Universiteti i Tiranes. Faqja Zyrtare, and worked side by side with the Natural Sciences Faculty to install some of our equipment, including: The Computer Controlled Solid-Liquid Extraction Unit, Isothermal Reactor with Stirrer, the Computer Controlled Pyrolysis Unit, the base-service unit, the Tabular Flow Reactor, the Computer Controlled Activated Sludge Process Unit, the Computer Controlled Biogas Process Unit, the Applications for Process Control and the Computer Controlled Liquid-Liquid Extraction Unit. It was a pleasure!