The Sorting Workstation, "AE-PLC-CF", designed by EDIBON, is a sorting workstation commanded by a PLC, which identifies the color and the type of the material of the input pieces and classifies them into three different places.

일반적인 설명보기

관련 뉴스

일반적인 설명

The Sorting Workstation, "AE-PLC-CF", designed by EDIBON, is a sorting workstation commanded by a PLC, which identifies the color and the type of the material of the input pieces and classifies them into three different places.

The "AE-PLC-CF" workstation is designed as a modular system to facilitate the understanding of the unit.

The main components are:

  • The PLC: is composed by the CPU limit and all extra modules needed to perform a corrent working of the workstation and all the extra modules needed to perform a correct working of the workstation.
  • The Control Panel: with start/stop button, emergency pushbutton, reset button, light indicators to show current state of the process, etc.
  • The Pneumatic Circuit: contains the required solenoid valves, the pressure components, the filters and regulators to assure the appropriate working of the workstation.
  • The Workstation: it is composed by real industrial components used by the rotary table systems such as reed sensors, presence sensors, DC motor, inductive sensors, rotary table with 8 positions, etc.

The "AE-PLC-CF" is an independent workstation that can work alone and/or in conjunction with other workstation to make up a complete Flexible Manufacturing System (*).

*The Flexible manufacturing systems product list is available at the "6.- MECHATRONICS and AUTOMATION" area.

연습 및 가이드

매뉴얼에 포함 된 가이드 실기 연습

  1. Introduction to flexible manufacturing system (FMS).
  2. Introduction to pneumatics and electro-pneumatics.
  3. Introduction to vacuum technology.
  4. Study of the sensor detection.
  5. Configuration of a pneumatic application.
  6. Manual control of a pieces sorting system.
  7. Automatic control of a pieces sorting system.
  8. Change the parameters of the pieces sorting process.
  9. Optimization of the process time.
  10. Study and analysis of the faults inserted in the process with the fault generation module.